{"id":2472,"date":"2012-10-04T17:01:56","date_gmt":"2012-10-04T15:01:56","guid":{"rendered":"http:\/\/de-construction.4o4.ch\/?p=2472"},"modified":"2015-02-25T23:58:53","modified_gmt":"2015-02-25T22:58:53","slug":"conference-cycle-derive-4","status":"publish","type":"post","link":"https:\/\/campus.hesge.ch\/construction\/?p=2472","title":{"rendered":"CYCLE D\u00c9RIVE #2 &#8211; Peter Downsbrough &#038; Elke Giffeler"},"content":{"rendered":"<p><strong>AS, IF, OR, TO<\/strong><\/p>\n<p><strong>Peter Downsbrough en conversation avec Elke Giffeler<\/strong><\/p>\n<p>Lines and fragments of language are Peter Downsbroughs tools to examine and re-structure given (architectural) situations\/contexts. The \u00ab\u00a0line\u00a0\u00bb that separates, divides can at the same moment connect. It may be tape on a wall, implanted as a pipe into a landscape or printed on a sheet of paper. By placing a line (or two) Peter Downsbrough investigates the dimensions of time and place of location. With a subtle intervention he achieves a spatial experience which leads to a new approach. In combination with or without the line, the artist uses isolated words such as \u00ab\u00a0AS, IF, OR, TO &#8230;\u00a0\u00bb thus confronting one with multiple options of reading\/understanding. It is open, sculptural, almost abstract and thereby challenges the viewer to take position.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>AS, IF, OR, TO Peter Downsbrough en conversation avec Elke Giffeler Lines and fragments of language are Peter Downsbroughs tools to examine and re-structure given (architectural) situations\/contexts. The \u00ab\u00a0line\u00a0\u00bb that separates, divides can at the same moment connect. It may be tape on a wall, implanted as a pipe into a landscape or printed on [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[14],"tags":[27],"class_list":["post-2472","post","type-post","status-publish","format-standard","hentry","category-conference","tag-cycle-derive"],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/campus.hesge.ch\/construction\/index.php?rest_route=\/wp\/v2\/posts\/2472","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/campus.hesge.ch\/construction\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/campus.hesge.ch\/construction\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/campus.hesge.ch\/construction\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/campus.hesge.ch\/construction\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2472"}],"version-history":[{"count":8,"href":"https:\/\/campus.hesge.ch\/construction\/index.php?rest_route=\/wp\/v2\/posts\/2472\/revisions"}],"predecessor-version":[{"id":4674,"href":"https:\/\/campus.hesge.ch\/construction\/index.php?rest_route=\/wp\/v2\/posts\/2472\/revisions\/4674"}],"wp:attachment":[{"href":"https:\/\/campus.hesge.ch\/construction\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2472"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/campus.hesge.ch\/construction\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2472"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/campus.hesge.ch\/construction\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2472"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}